Active Execution Plans

Use one evolving plan per coherent workstream when work needs durable memory. Use docs/templates/exec-plan.md, keep progress and validation current, avoid parallel duplicate plans for the same workstream, and move a plan to ../completed/ only after the result is verified.

Daemon

Production publish is framework-dependent single-file. AOT spike: completed (rolled back). UI/AOT: 0032. JSON facades: 0031plan completed. Remaining object? on invoke/batch DTOs is 0031 follow-up, not an active plan.

Test gaps (closed)

Headless-automatable gaps closed: 2026-09-04-known-test-gaps. Remaining live-host / year-matrix / pixi-opt-in stay in test-matrix.md.

MCP tests (active)

Split god project DevTools.Mcp.Tests into module-scoped projects: 2026-09-04-mcp-test-project-split.

MCP (closed)

  • Product: 0027. Host pipe: 0012.
  • Host-wire 2.2: 2026-08-31.
  • Spec engine: 2026-08-02.
  • Layer identity S5: 2026-09-03 — landed. Open follow-on (no plan yet): S1 vs S2 packaging gate; SDK-free host contracts.
  • MRTR: 2026-08-02 — G1 landed; elicitation/progress not product (0027).

MTP Testing

Track Decision Plan Status
P1 testing core 0020 completed Landed
Kernel extract 0021 completed Landed — PolySharp not in plan
Open-closed providers 0024 completed Landed
Contract narrow completed Landed 2026-09-10 — machine-run rename deferred
TUnit spike completed Closed 2026-09-04 — not a production track

NUnit MTP-only (0022) is completed.

No active execution plans besides the MCP test split.