Date: YYYY-MM-DD
Proposed | Accepted | Superseded | Rejected
If superseded, keep a short stub (~15 lines) with a pointer to the replacement. Do not delete the file when completed plans still link it.
What problem, constraint, or ambiguity forced this decision?
What did we decide? Record choices (adopt / refuse / why), not phase
checklists or landed-work diaries — those belong in docs/plans/active/.
- Alternative.
Positive:
- Item.
Tradeoffs:
- Item.
- Item.