Skip to content

plan: sessions 193–217 — held idle rows, then S1(a) #453 merged - #452

Merged
cyberia-apparatus merged 27 commits into
release/phase1from
plan/idle-20261028
Oct 28, 2026
Merged

cyberia-apparatus merged 27 commits into
release/phase1from
plan/idle-20261028

Conversation

@cyberia-apparatus

Copy link
Copy Markdown

What

Session 193's log row in release/director/plan.md, plus a decision. Idle sessions append to this branch instead of merging into release/phase1.

Why

Each idle plan merge moves the head of soft3#376 (release/phase1 → main), which is waiting for the owner's approval. cyberia-apparatus cannot read whether main's protection dismisses stale reviews (branches/main/protection/required_pull_request_reviews 404, session 192). So an idle merge just after the owner approves could cost the approval. The idle rows carry no new state: the tick diff is empty.

Verified

Remains

The first session whose tick changed merges this PR together with its own row.

Risk

Contained: a docs-only change on the director's branch. release/phase1 shows the plan as of session 192 until this merges.

🤖 Generated with Claude Code

An idle plan merge moves soft3#376's head while it waits for the owner's
approval; held on a branch until the tick changes.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@cyberia-apparatus cyberia-apparatus added the contained lane: contained (deliver.md § lanes) label Oct 28, 2026
…ot a change

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@cyberia-apparatus

Copy link
Copy Markdown
Author

Session 194 appended (76c9aef). This tick's changed=1 came only from this PR appearing in .prs. With at and .prs[].mergeable removed, the diff against 20261028T032058Z holds just the #452 entry. A change caused only by the director's own idle PR does not count, so this PR stays open.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@cyberia-apparatus

Copy link
Copy Markdown
Author

Session 195 appended (272cdde). The tick 20261028T035448Z differs from 20261028T033741Z only in at (tick.log changed=0). The owner's PRs are at the same heads with 0 reviews, and the newest train run is still 40570117323. Nothing is merged; this PR stays open.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@cyberia-apparatus

Copy link
Copy Markdown
Author

Session 196: idle. Tick 20261028T041109Z is unchanged apart from its timestamp. The owner's newest event is still 2026-10-27 19:24:30, and the newest train run is still 40570117323 (red: package-resolution, which clears with lens#36). Added the row in 4e6781e. This PR stays open and is not merged into release/phase1 (sessions 193–194).

cyberia-apparatus and others added 22 commits October 28, 2026 04:28
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
…6164861

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
…tatus column

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
…S1a)

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
…, diag 40667783477

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
…0656164861's receipts

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@cyberia-apparatus cyberia-apparatus changed the title plan: idle sessions from 193 — held off release/phase1 until the tick changes plan: sessions 193–217 — held idle rows, then S1(a) #453 merged Oct 28, 2026
@cyberia-apparatus
cyberia-apparatus merged commit 59d76db into release/phase1 Oct 28, 2026
1 check passed
@cyberia-apparatus cyberia-apparatus added the ready agent-reviewed, green, waiting for a merge label Oct 28, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

contained lane: contained (deliver.md § lanes) ready agent-reviewed, green, waiting for a merge

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant