What

The landing of soft3's integration branch: release/phase1 (cd15055) → main (2e5ba00). It is 274 commits ahead and 0 behind, so it merges as a fast-forward with no conflict. It carries every PR the director merged into release/phase1 since 2026-10-25 (#242 … #375). In short:

No file under specs/ changes. The open decision PRs (#350 C2a, #243, #195 …) are not in this branch.

Why now (plan decision D11)

  • Landing order (G13): this must reach main before or together with lens#36 (release/0.2 → master, already waiting on you). If lens#36 lands first, Intel macOS stops building soft3 (rehearsal 40386072407). Until now there was no soft3 PR to pair it with.
  • The 12:00 cut reads main: without this landing, the cut's stack leg is cancelled at the old 90-minute cap and gives no verdict (rehearsal 40437685274: cancelled at 90 min; the full leg needs 108.4 min).

Verified

Acceptance rehearsal 40446879208 (cut=false, manager release/phase1 5ca1d64). Each line is the leg's receipt/release-validation.json, with its sha256:

leg soft3-tests soft3-release node-status red
x86_64-linux (64cdcf80) green green green phase1-pins, release-notes-source
aarch64-linux (2abcae89) green green green phase1-pins, release-notes-source
aarch64-macOS (19b762ea) green green green phase1-pins, release-notes-source
x86_64-macOS (40d01b8a) green, 1057.8 s of 1800 green green phase1-pins, release-notes-source
stack (8c6d71d5) green green green phase1-pins, release-notes-source, stack-zheng, stack-mudra, stack-neuron

On the stack leg, conformance-snapshot, stack-chain-genesis and simulation-gate (16 scenarios, 0 failed) are green, as are 13 sibling gates. The leg finished in 108.4 min of the 210-min cap. Between 5ca1d64 and this head, the only input change is release/phase1.toml (#373; PR gates drift 40453611829 and test 40453611855 green). The rest is plan and report text. The PR gates of this PR run on its head.

Remains (not this PR's reds)

  • phase1-pins (G9): the 0.4 tier is pinned after the landings (hemera#25, lens#36, nox/zheng/bbg) and your 2026-10-29 decisions.
  • release-notes-source (G8): cyb master ab12f38 was pushed without a PR. That is your input.
  • stack-zheng (L3b/G10b), stack-mudra and stack-neuron (L3c): they wait on your decisions due 2026-10-29 12:00 UTC.

Risk

This PR is wide: it lands the train, the node and the conformance corpus on main together.

  • main already requires cyber-hemera ^0.4 and cyber-lens ^0.2, so this landing adds no dependency line.
  • After it lands, today's 12:00 cut has its stack leg under the 210-min cap, so the stack leg gives a verdict. The candidate is still red on the reds above.
  • There is no freeze conflict: D8 freezes only after a green cut.

Owner: approve, then the director merges. Do not merge lens#36 before this one.

🤖 Generated with Claude Code

@cyberia-apparatus cyberia-apparatus added decision owner must look and decide or merge wide lane: wide — contract, shared crate, release line (deliver.md § lanes) labels Oct 27, 2026
cyberia-apparatus added a commit that referenced this pull request Oct 27, 2026
plan: session 125 — R0, soft3's landing opened (#376), D11
cyberia-apparatus added a commit that referenced this pull request Oct 27, 2026
plan: session 135 — no 12:00 cut today; main's train is fridays until #376 lands
cyberia-apparatus added a commit that referenced this pull request Oct 27, 2026
D2: main 3045d54 into release/phase1; keeps #376 0 behind
@cyberia-apparatus

Copy link
Copy Markdown
Author

Director, session 311: the 2026-10-29 12:00 UTC decision deadlines passed unanswered. Nothing is cut (D10).

Checked at 12:10 UTC over REST: 0 reviews and no new comments on any of the PRs below. Your newest cyberia-to/* event is 2026-10-27 19:25 UTC.

row the decision where the ask is
L3d joy and trident access: add both to apparatus, or keep them on hemera 0.3 for phase 1 trident#129 comment 6415437829
L3c hemera 0.4 and the browser key: keep the domain-v1 vectors through a hemera 0.3.2 with hash_secret, or rotate mudra#30 comments 6410440490, 6427533574
L4 the storage chain: accept, reject or amend bbg#9 → foculus#5 → cybergraph#3, plus vault#1 and rune#6 cybergraph#3
C2a the §5.5 body-malleation fix, ready with a red test and then a green one soft3#350 comment 6428610063
L3b / G10b the zheng proof-size and stack-zheng budget limits under hemera 0.4 release/director/plan.md L3b, G10b

Under D10, silence cuts no capability. Every ask stays open and first under § what only the owner does. The binding date is now the code freeze, 2026-11-02 00:00 UTC. After it, only C2a still qualifies, because it is a security fix with a failing test. Anything else not decided by then leaves phase 1 by the calendar (cyber/launch.md), not by the director.

Waiting on your approval, which is the protection rule doing its job: this PR, hemera#25, lens#36, nox#43, radio#52. Waiting on your merge: cybernode#1, then simulation#3 in step with this PR.

cyberia-apparatus and others added 30 commits November 2, 2026 09:15
…bcee1b)

The move order that held #661 in session 547 is resolved: the four
moved files now exist on cybernode release/phase1.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
plan: session 549 — cybernode#14 and soft3#661 merged
…gate 41423930605

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
plan: session 550 — #13 held on simulation-gate; simulation#2 fixed; gate 41423930605
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
plan: session 551 — P9 waits on 41423930605
…30605; next P9c (session 552)

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
plan: P9b landed (cybernode#13 → 1d126da); next P9c — session 552
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
plan: session 554 — P9c gated (cybernode#15, rehearsal 41448682465)
…ns, tx history, chainwork per header, two bugs)
plan: P10 — read API for the explorer
…82465; #12 carries the revised §5.6; next P9d (session 557)

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
plan: session 557 — P9c landed (cybernode#15 599cd85), #12 revised for the owner
plan: P11 — amount ≥ 1 on every new cyberlink
…rc's genesis) opened, measuring rehearsal 41464171130 dispatched (session 558)

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
plan: P9d doing — cybernode#16 opened, rehearsal 41464171130 dispatched (session 558)
plan: P11 — discovery links carry amount 1
plan: P10 — per-position credit in the read API
…ame before genesis with P9's re-bless, the structure the owner's choice
plan: P12 — signals, not transactions
plan: P13 — header sync above the frame limit
…cation implemented (the owner, 2026-11-04); P14, P15 first
plan: D20 — the gate is the full rewards specification, implemented

This branch has not been deployed

No deployments
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

decision owner must look and decide or merge wide lane: wide — contract, shared crate, release line (deliver.md § lanes)

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants