Skip to content

[9.6] [scout] migrate x-pack/platform/test/accessibility/apps/group1/dashboard_links to scout (#301737) - #302145

Merged
kibanamachine merged 1 commit into
elastic:9.6from
kibanamachine:backport/9.6/pr-301737
Oct 30, 2026
Merged

kibanamachine merged 1 commit into
elastic:9.6from
kibanamachine:backport/9.6/pr-301737

Conversation

@kibanamachine

Copy link
Copy Markdown
Contributor

Backport

This will backport the following commits from main to 9.6:

Questions ?

Please refer to the Backport tool documentation

…ard_links to scout (elastic#301737)

Closes elastic#272644
Closes elastic#276442
Closes elastic#274967

Fixes flakiness by removing save dashboard from test.

Also turns on links test in CI. Turns out they have been disabled this
entire time - yikes

(cherry picked from commit dad7b3d)
@infra-vault-gh-plugin-prod

Copy link
Copy Markdown
Contributor

💛 Build succeeded, but was flaky

Failed CI Steps

Metrics [docs]

Page load bundle

Size of the bundles that are downloaded on every page load. Target size is below 100kb

id before after diff
kbnUiSharedDeps-srcJs 5.4MB 5.4MB +4.0B
Unknown metric groups

warm start memory

id before after diff
post forced gc heap baseline - 732571778 +732571778
post forced gc heap delta - -2426368 -2426368
post forced gc heap delta standard deviation - 2585792 +2585792
post forced gc heap target - 730145410 +730145410
tail heap delta - -9723159 -9723159
total +1453153453

Test Failures

  • [job] [logs] FTR Configs #27 / apis Streams Preconfigured Definitions routes document matching the condition to child stream

cc @nreese

@kibanamachine
kibanamachine merged commit 2f9ec8f into elastic:9.6 Oct 30, 2026
37 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport This PR is a backport of another PR

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants